![Loading Events](https://ev-magazine.com/wp-content/plugins/the-events-calendar/src/resources/images/tribe-loading.gif)
- This event has passed.
Grand Opening event for WattEV’s third electric truck charging depot in Bakersfield.
May 6 @ 11:00 am - 1:00 pm
![](https://ev-magazine.com/wp-content/uploads/2024/05/RSVP.jpg)
Date: Monday, May 6th, 2024
Time: 11 a.m. – 1 p.m.
Location: 18836 Highway 65 Bakersfield, CA 93308
Get Charged Up in Bakersfield!
- 14 dual-cord 360 kW chargers
- 18 single-cord 240 kW chargers
- 3 single-cord MCS 1.2 MW chargers
- 35 chargers total
- Near major distribution centers
- Public Restrooms
- On-site attendance 24/7
- Vending Machines